Reclaimed Void, 2013
Pre-cast concrete panel (GRC, EPS, MS), Cantilever suspension system
DUCTAC, Mall of the Emirates, Dubai
DUCTAC, Mall of the Emirates, Dubai
3 x 3.3 x 0.15 m
45
of
45